GoalBus® disminuirá un 40% el tiempo de traslado y facilitará la movilidad de 130 mil personas al día

GoalBus® will reduce a 40% the travel times and will ease the mobility of 130 thousand people per day

MARCH, 2018. Mexico.

BRT Metrobus system in Mexico City launches the line 7, the most modern and innovative one of the system

Nowadays, Goal Systems plans the 6 Metrobus lines, and, it will soon plan line 7 as well. This new line will operate with 90 double-deck buses through one of the most representative avenues in Mexico City, with more than 15 kilometers long.
Our tool GoalBus® planning will reduce a 40% the travel times and will ease the mobility of 130 thousand people per day. The fleet will substitute the current 180 buses, transporting the same amount of people than 9,720 cars. Besides, the line will be connected with the already existing Metrobus lines and the Sistema Colectivo de Metro. There will be 29 bus stops and 2 terminals.
Currently, the fleet is composed by 650 buses. This year, due to the expansion of line 5, there will be 90 more buses and 3 roadway corridors are expected for the next years, up to 1,250 buses.
The operation of line 7 buses will have real time geo localization and communication with the Metrobus control center and Mexico City Government, who will receive images, audios, and the information shown on the onboard screens. The buses will be Enviro50 model, the ones used in the major world capitals, Alexander Dennis British style.
Goal Systems is a reference in planning and optimization systems in Mexico. The successful results of each performed implementation increases the interest of companies and businessmen on our tools.

 

Micaela Gomez